Sign In | Join Free | My fazendomedia.com
China Hengshui Decheng Machinery & Equipment Co., Ltd. logo
Hengshui Decheng Machinery & Equipment Co., Ltd.
Active Member

8 Years

Home > AAC Block >

AAC Block Production Plant / Equipment

AAC Block Production Plant / Equipment

Packaging Details : wooden case

Payment Terms : L/C, T/T

Place of Origin : China

Trade Terms : FOB

Production Capacity : 50000 Cum/Year~300000cum/Year

Standard : ISO

Min. order : 1 Sets

Main Markets : South America, Eastern Europe, Southeast Asia, Mid East, Eastern Asia

Category : Plastic Cutting Machinery

Contact Now

1. Annual production capacity of AAC Block Production Plant / Equipment:
50, 000 cum/year, 100, 000 cum/year, 150, 000 cum/year, 200, 000 cum/year, 300, 000 cum /year,
2. Curing methods: Using autoclave
3. Raw material: Fly ash(or Sand), cement, lime, gypsum, aluminum powder
4. Product specification(general specification)
Length: 600mm
Height: 200mm; 250mm; 300mm
Width: 60mm; 120mm; 180mm; 240mm(increased gradually by 60)
50mm; 75mm; 100mm; 125mm; 150mm
(increased gradually by 25)
5. Quality standard: In conformity with GB/T11968-1997 Standard.
6. Production technology:
According to raw material's category, quality and technological characteristics of main equipments, etc, different technologies can be adopted to produce aerated concrete block. Generally, the production steps are as follows:
(1) The raw materials such as lime, cement, gypsum, sand(or fly ash), etc are stored in silo(tank) for use after treatment.
(2) Aluminum powder or aluminum paste is stored for use after treatment.
(3) Raw material is measured by electrical scale with certain proportion. After measured, aluminum powder and water are fed into aluminum powder mixer to make into suspension liquid.
(4) Water for proportioning( cold water or hot water from hot water tank) is measured by electrical scale.
(5) After measured, raw materials and aluminum liquid are fed into casting mixer orderly to be mixed evenly and cast in moulds(if making plank, then reinforcing mesh should be put in the mould before hand).
(6) After stopping and precuring under certain temperature for certain time, the green blocks will reach to certain strength. And then they are turned 90° By turning hanger and onto cutter for demoulding and cutting.
A. Doing side cutting and milling groove first
B. Doing vertical level cutting secondly
C. Doing horizontal cutting finally
D. Cut green blocks should be handled by travelling crane to steaming cart before autoclave for palletizing and grouping.
(7) Grouped green blocks are entered into autoclave for steam curing.
(8) After leaving autoclave, cured products are severed by block severing machine.
(9) Then finished products are conveyed to finished product storage yard and stacked according to specification.
(10) After product discharge, the steam carts and side plates will be back for next circulation. After cleaned, they are grouped with mould frame demoulded from turning hanger and turned 90° And then they are returned to casting mixer for next casting.&

Best AAC Block Production Plant / Equipment wholesale

AAC Block Production Plant / Equipment Images

Inquiry Cart 0
Send your message to this supplier
 
*From:
*To: Hengshui Decheng Machinery & Equipment Co., Ltd.
*Subject:
*Message:
Characters Remaining: (0/3000)